DRIP DATA MONITORING
NAME:______________________________DATE: ___ / ___ / ___
Address:______________________________Time: ___ : ___ AM PM
______________________________
Press (F1) to return to main menu at any time. Press the noted (F2,F3) to review and (F4) to edit the referenced registers. After thirty seconds of inactive viewing of a register, the hand held will return to the top of the function register in use. After another for minutes of inactivity, the hand held will return to the menu.

Legend: (m) minutes, (h) hours, (t) tenths of a second. All rest times are in minutes.
Scr. No.(F2) DATA RECORDVALUE
1

Zone 1 Dose Counter 
Zone 1 Dose ETM (m) 
2

Zone 2 Dose Counter 
Zone 2 Dose ETM (m) 
3

Zone 3 Dose Counter 
Zone 3 Dose ETM (m) 
4

Zone 4 Dose Counter 
Zone 4 Dose ETM (m) 
5

Pump 1 Counter 
Pump 1 ETM (m) 
6

Pump 2 Counter 
Pump 2 ETM (m) 
7

Peak Dose Counter 
Peak Enable ETM (m) 
8

Jigh Lvl Counter [opt.] 
High Lvl ETM (m) [opt.] 
9

Peak Zone ETM (m) 
Peak SF ETM (m) 
10




Zone 1 Field Flush Ctr. 
Zone 2 Field Flush Ctr. 
Zone 3 Field Flush Ctr. 
Zone 4 Field Flush Ctr. 
Scr. No.(F3) VIEW STATUSVALUE
1



Current 
Target Run Time (t) 
Elapsed Run Time (t) 
2

Zone Rest Target 
Elapsed Rest Time 
3

SF Target Rest Time 
SF Elapsed Time (m) 
4




Z1 FF Dose Cnt 
Z2 FF Dose Cnt 
Z3 FF Dose Cnt 
Z4 FF Dose Cnt 
5

Next Zone to Dose 
Backflush Timer (t) 
6




S.F. 
Peak 
Duplex 
0=Off / 1=On
Scr. No.(F4) EDIT SETTINGSVALUE
1




Zone 1 Run Time (t)1,500-11,700
Zone 2 Run Time (t)1,500-11,700
Zone 3 Run Time (t)1,500-11,700
Zone 4 Run Time (t)1,500-11,700
2




Zone 1 Dose %100
Zone 2 Dose %100
Zone 3 Dose %100
Zone 4 Dose %100
3

2Z STD Enable Rest180
2Z Peak Enable Rest108
4

3Z STD Enable Rest120
3Z Peak Enable Rest72
5

4Z STD Enable Rest90
4Z Peak Enable Rest54
6



SF OFF Rest Time190
SF STD Enable Rest90
SF Peak Enable Rest45
7

Peak Dose Allow (h)72
Auto FF Time Int. (h)336
8




Z1 FF Count Interval25
Z2 FF Count Interval25
Z3 FF Count Interval25
Z4 FF Count Interval25
9Back Wash Frequency (t)3,000

Note: All SF Registers are Optional features




INSPECTION AND OPERATION PROCEDURE
ONSITE DRIP DISPERSAL SYSTEM

I.Monitoring Schedule Frequency
A.Periodic Inspection
B.Compile and review (submit) data
II.Peridic Inspection
A.Field Conditions
1.Walk the field and record any visible wet spots from the drip system.
2.O.K.___ Repair___ Comments and remedial action
______________________________
B.Controller
1.Lights and manual switch positions.
a.Open the control panel and open the lid to the hydraulic unit and pump tank. Make sure all manual switches are in the automatic position. With Microprocessor on, verify power light and run light are on.
b.O.K.___ Comments and remedial action
______________________________
2.Microprocessor input: See table in owners manual.
a.O.K.___ Comments and remedial action
______________________________
3.Microprocessor output: Verify there is output only when in automatic operation. You may start automatic cycle with "Reset/Stop" button.
a.O.K.___ Comments and remedial action
______________________________
C.Pump Tank Liquid Level Float Switches
1.Check liquid level in the pump tank to confirm switch operation.
a.If a float is down, its light should be off. Note; High level alarm float requires optional relay installed in control.
2.O.K.___ Comments and remedial action
______________________________
D.Pump and Valve Operation
1.Place pump "Hand-Off-Auto" switch in the "Hand" position to dead head pump against valves. Then open (optional) master valve. Flow meter should not turn indicating there are no leaks.
2.O.K.___ Comments and remedial action
______________________________
3.With the pump running, place each zone valve in the "Hand" (open) position one at a time to check operation. With one zone valve open, flow should register on the flow meter. When the zone valve closes (off position), the flow should stop.
4.O.K.___ Comments and remedial action
______________________________
5.With one zone valve open and flowing, close and reopen (optional) master valve to check operation.
6.O.K.___ Comments and remedial action
______________________________
7.With the pump in the "Hand" position open the filter backwash valve for filter on and two for ten seconds then close. There should be no flow registering in the flow meter and you should hear the valves open and close. The backwash return valve diaphragm will rise then lower during backflush.
8.O.K.___ Comments and remedial action
______________________________
9.Return all switches to the automatic position
E.Hydraulic Unit
1.Examine one filter and clean all filters as needed.
2.Examine all hydraulic components for leaks, tubing crimps and other problems.
3.Determine how many zones are in operation and the installed flow rates from the installation records.
III.Annual Inspections (Includes Periodic Inspection)
A.Extended Check - Zone Dose Rates
1.Open the air release valve boxes and inspect. Make sure they close during the dose with no water leak after air is evacuated.
2.O.K.___ Comments and remedial action
______________________________
3.Determine how many zones are in operation and the installed flow rates from the installation records.
4.O.K.___ Comments and remedial action
______________________________
5.With the pump in the "Hand" position, select the first zone by placing the zone valve switch in the "Hand" position. After pressurization time, check flow rates by reading the flow meter for a timed minute. Repeat for all zones. If flow varies by more than 10% from original flow rates, reset flow rates.
6.O.K.___ Comments and remedial action
______________________________
7.After the final zone is checked, place the "Zone Return" valve in the "Hand" position while the "Zone Valve is still in the "Hand" position and verify that the flow rate increased to provide field flushing.
8.O.K.___ Comments and remedial action
______________________________
9.Return appropriate switches to the automatic position.
10.O.K.___ Comments and remedial action
______________________________
11.Press reset button for 5 seconds and check automatic zone dosing time.
12.O.K.___ Comments and remedial action
______________________________
B.Tanks & Pumps
1.Examine and clean effluent screens, filters, and floats as needed.
2.O.K.___ Comments and remedial action
______________________________
C.Measure solids level in all tanks
1.Septic Tank Tank Depth _______ Sludge Depth _______
2.Settling Tank Tank Depth _______ Sludge Depth _______
3.Dose Tank Tank Depth _______ Sludge Depth _______
a.Sludge pumping required? Yes___ No___
IV.Reporting
A.Provide summary report to customer showing gallon flow to each field along with pertinent operating information and suggestions.
B.Provide signed and dated inspection report to customer file and regulatory agency as needed.
C.Have records available and be prepared to discuss operation and maintenance specifics with customer personnel.
V.Operator Signature ___________________________________ Date: __________

Perc-Rite® Dealers are authorized to reproduce forms in this manual as needed for each site. Additional comments (use back of copy if necessary):



Address:_________________________
_________________________
Time: ___ : ___ AM PM
American Perc-Rite® Drip Startup LogUSER LOG
LineAs-BuiltDescription            Number of Zones: __DateDateDateDate
1 BEDROOMS    
2 GALLONS PER DAY    
3 TEXTURE GROUP    
4 GPD/FT2 DESIGN SOIL LOADING RATE    
5 TOTAL LINEAR FEET TUBING    
6 GPD/LF FT DESIGN TUBING LOADING    
7 METER READING    
8 ZONE 1 LINEAR FEET OF TUBING    
9 ZONE 1 NUMBER OF FIELD FLUSH    
10 ZONE 1 GPM DOSING FLOW RATE    
11 ZONE 1 GPM TOTAL FLUSHING FLOW    
12 ZONE 1 RUN TIME    
13 ZONE 2 LINEAR FEET OF TUBING    
14 ZONE 2 NUMBER OF FIELD FLUSH    
15 ZONE 2 GPM DOSING FLOW RATE    
16 ZONE 2 GPM TOTAL FLUSHING FLOW    
17 ZONE 2 RUN TIME    
18 ZONE 3 LINEAR FEET OF TUBING    
19 ZONE 3 NUMBER OF FIELD FLUSH    
20 ZONE 3 GPM DOSING FLOW RATE    
21 ZONE 3 GPM TOTAL FLUSHING FLOW    
22 ZONE 4 LINEAR FEET OF TUBING    
23 ZONE 4 LINEAR FEET OF TUBING    
24 ZONE 4 NUMBER OF FIELD FLUSH    
25 ZONE 4 GPM DOSING FLOW RATE    
26 ZONE 4 GPM TOTAL FLUSHING FLOW    
27 ZONE 4 RUN TIME    
28 PEAK ENABLE CYCLE COUNTER    
29 HIGH LEVEL CYCLE COUNTER    
30CONTRACTOR STARTUP REPRESENTATIVE:    
31STARTUP DATE:    
CONTRACTOR'S NAME & PHONE:




Note to Owner: Any changes to pump run timer should be recorded in manual on this page





AMERICAN MANUFACTURING COMPANY, INC.
Last revised: Jan-9-2006
Comments to: info@americanonsite.com
Copyright © American Manufacturing Company, Inc., 2000

HOME | ABOUT | ORDER INFO | PRODUCTS | DRIP SYSTEMS | CONTROLS | CONTACT | DATA CENTER | SITE MAP